Every conversation about artificial intelligence is, underneath, a conversation about electricity and water. The models get the attention. The inputs that make them possible rarely do — and the numbers behind them are no longer small.
The scale of the demand
In the United States, Lawrence Berkeley National Laboratory estimates that data centres used 4.4 percent of national electricity in 2023, and that the share could reach between 6.7 and 12 percent by 2028.
Electricity is the visible half of the bill. Water is the other.
The quieter constraint
Data centres generate heat, and heat has to be removed. In many facilities that still involves water. Berkeley Lab estimates that US data centres consumed about 66 billion litres of water directly for cooling in 2023, and its scenarios for 2028 range from roughly double to roughly four times that. A far larger volume — a modelled estimate of around 800 billion litres — was used indirectly, through the generation of the electricity that runs them.
One distinction matters here. Water that circulates through a cooling system is not the same as water consumed through evaporation. Newer facility designs can avoid evaporative consumption, usually at a cost in energy. The question is never simply whether a data centre uses water, but how it ultimately rejects its heat — and what that choice costs in water, power and reliability together.
None of this is an argument against the technology. It is an observation about where the pressure is accumulating.
The timing problem
The sharpest tension is not volume but speed. The IEA notes that a data centre can be built in roughly one to three years. Planning and completing the grid infrastructure to power it takes five to fifteen. Over 2,500 gigawatts of generation, storage and large-load projects are stalled in grid connection queues worldwide. The IEA estimates that around 20 percent of planned data centre projects could be at risk of delay as a result. The digital layer is being built faster than the physical layer that has to carry it.
The questions worth asking
A demand this large and this time-sensitive rarely stays only a cost. It is worth asking what else it might become.
Could a large, well-financed and time-sensitive new water user change how water infrastructure is financed? What happens to a model built slowly and priced cheaply when a single sector needs guaranteed supply, in a specific place, on a three-year timeline?
Could data centres become anchor customers for water systems that would not otherwise be built — treatment capacity, desalination, reuse — as large industrial users once anchored power plants and ports? Could supplying water to computation become an industry in its own right, with its own economics, rather than a cost line inside someone else's? And where projects are designed for it, who else in a region could draw on infrastructure built to serve them?
Could the pressure itself push cooling toward designs that need less water — closed-loop systems, treated wastewater, non-potable sources — and would that, in turn, make those technologies cheaper for every other industry that needs them?
Could the heat itself become useful — a source of utility rather than only a consumer of it?
And could the same computation that consumes the water help manage it? The IEA's own analysis argues that AI has the potential to transform how the energy sector works. Does the same hold for water networks?
Early answers to some of these already exist. Industrial water-reuse utilities have been built with data centre operators as founding customers. In Europe, recovered data centre heat already feeds district heating networks, and EU energy-efficiency law now expects larger facilities to recover their waste heat as a matter of course. The open question is where such models scale, under what conditions, and who captures the value.
The attention economy rewards what is new. The physical economy depends on what is old, heavy and patient. The next few years will be shaped by how those two timelines are reconciled — and by whether the urgency of one is allowed to strengthen the other.
Disclaimer
This article is provided for general informational purposes only and reflects views as at the date of publication. It does not constitute investment, financial, legal or professional advice, or an offer, solicitation or recommendation in respect of any security, fund, strategy or transaction. Third-party figures are quoted from the sources cited and have not been independently verified; any reference to EIH’s investments or future activity reflects current intention only and is subject to change. EIH’s full disclaimer applies: www.eihuae.com/disclaimer
- 1. International Energy Agency, Key Questions on Energy and AI (2026) — https://www.iea.org/reports/key-questions-on-energy-and-ai/executive-summary
- 2. International Energy Agency, Energy and AI (2025) — https://www.iea.org/reports/energy-and-ai/executive-summary
- 3. International Energy Agency, Electricity 2026, Grids — https://www.iea.org/reports/electricity-2026/grids
- 4. Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report (2024) — https://eta-publications.lbl.gov/publications/2024-lbnl-data-center-energy-usage-report
- 5. US Environmental Protection Agency, Water Reuse Case Study: Quincy, Washington — https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington
- 6. European Union, Directive (EU) 2023/1791 on energy efficiency (recast), provisions on data centre waste heat recovery — https://eur-lex.europa.eu/eli/dir/2023/1791/oj